Southbound closure of Basingstoke Road at the Whitley Pump from 16 February

Gas main replacement on Basingstoke Road

A 20 metre stretch of Basingstoke Road southbound from the Whitley Street roundabout will be closed from 16 February for gas main replacement and reinforcement work.

Continue reading

Advertisements

Walking stage I of Reading’s IDR

The IDR as it was intended to be built at the time that Stage I was under construction.

Construction of Reading’s Inner Distribution Road (IDR) started in 1969, but it had been included in development plans since 1957 and no doubt was a twinkle in someone’s eye some time before that. It still bothers Reading’s civic soul when proposals are brought forward to make it one-way or to cover over part of it or turn it into a park.

Continue reading

Introduction to “a walk around Reading’s IDR”

The IDR as it was intended to be built at the time that Stage I was under construction.

The Whitley Pump is leading a walk around Reading’s Inner Distribution Road (IDR) as part of this year’s Heritage Open Days in September. Reading’s post-war history, in which it transformed from a primarily industrial to a retail town, circle the IDR like the IDR circles the town centre.

Continue reading